CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the engine water pump assembly removal/installation are shown below.
| Replacement Part or Procedure | Necessary Procedures | Effects/Inoperative when not Performed | Link |
|---|---|---|---|
| Battery terminal is disconnected/reconnected | Drive the vehicle until stop and start control is permitted (approximately 15 to 40 minutes) | Stop and start system | |
| Memorize steering angle neutral point | Panoramic view monitor system | ||
| Initialize back door lock | Power door lock control system | ||
| Initialize servo motor | Air conditioning system | ||
| Reset slide door close position | Power slide door system | ||
| Reset back door close position | Power back door system |
PROCEDURE
DRAIN ENGINE COOLANT
REMOVE GENERATOR ASSEMBLY
REMOVE V-RIBBED BELT TENSIONER ASSEMBLY
Type A:
Remove the dust cover from the V-ribbed belt tensioner assembly.
Using SST, remove the bolt and V-ribbed belt tensioner assembly from the water inlet housing.
Type B:
Using SST, remove the bolt and V-ribbed belt tensioner assembly from the water inlet housing.
REMOVE ENGINE WATER PUMP ASSEMBLY
Remove the 7 bolts, engine water pump assembly and water pump gasket.