DESCRIPTION
The illuminated entry system controls engine switch illumination.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Before replacing the certification ECU (smart key ECU assembly), refer to the smart entry and start system (for Entry Function) precaution Click here.
PROCEDURE
PERFORM ACTIVE TEST USING GTS (ENGINE SWITCH)
Using the GTS, perform the Active Test Click here.
| Tester Display | Test Part | Control Range | Diagnostic Note |
|---|---|---|---|
| Power/Engine SW Light | Engine switch illumination | ON/OFF | - |
| OK |
|---|
| Engine switch illumination illuminates. |
| NG |
|
INSPECT ENGINE SWITCH Click here |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
INSPECT ENGINE SWITCH
Remove the engine switch Click here.
Inspect the engine switch Click here.
| NG |
|
REPLACE ENGINE SWITCH Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (ENGINE SWITCH - CERTIFICATION ECU [SMART KEY ECU])
Disconnect the I32 engine switch connector.
Disconnect the B75 certification ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY)