THROTTLE BODY INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips

Perform "Inspection After Repairs" after replacing the throttle body with motor assembly.


PROCEDURE


  1. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

    Tech Tips

    Perform "Inspection After Repairs" after replacing the throttle body with motor assembly.



    1. Install 3 new gaskets to the intake manifold, intercooler assembly and No. 2 air tube.

      Tech Tips

      Check that the gasket is securely fitted into the installation groove.

    2. Install the throttle body with motor assembly and No. 2 air tube to the intake manifold with the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. B008I5FN01

      Temporarily connect the No. 2 air tube to the intercooler assembly with the 4 bolts in the sequence shown in the illustration, and then tighten the bolts at the specified torque.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Connect the No. 2 water by-pass hose and No. 11 water by-pass hose to the throttle body with motor assembly, and then slide the 2 hose clamps to secure the hoses.

    5. Connect the throttle body with motor assembly connector.

    6. Install the wire harness bracket with the bolt.

      Torque:
      12.5 N*m  { 127 kgf*cm, 9 ft.*lbf }
    7. Attach the 2 wire harness clamps to the wire harness bracket to connect the wire harness.

  2. INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY (for AWD)

    Click here

  3. INSTALL EXHAUST PIPE ASSEMBLY

    Click here

  4. ADD ENGINE COOLANT

    Click here

  5. INSPECT FOR COOLANT LEAK

    Click here

  6. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY

    Click here

  7. PERFORM INITIALIZATION

    Click here