PROCEDURE
INSTALL EXTENSION HOUSING DUST DEFLECTOR
Using SST and hammer, tap in the extension housing dust deflector.
INSTALL WIRING HARNESS CLAMP BRACKET
| *A | w/ Intelligent Manual Transmission Switch |
Install the 6 bolts and 5 wiring harness clamp brackets to the manual transmission assembly.
INSTALL TRANSMISSION BREATHER SUB-ASSEMBLY
Install the 3 bolts and 3 brackets to the manual transmission assembly.
Install the transmission breather sub-assembly to the control shift lever retainer sub-assembly.
Attach the 4 breather hose clamps.
INSTALL MANUAL TRANSMISSION ASSEMBLY
Install the manual transmission assembly with the 5 bolts.
CONNECT WIRE HARNESS
w/ Intelligent Manual Transmission Switch:
Connect the 2 connectors.
Install the bolt.
Attach the 6 wire harness clamps.
w/o Intelligent Manual Transmission Switch:
Connect the connector.
Install the bolt.
Attach the 3 wire harness clamps.
w/ Stop and Start System:
Connect the neutral position switch connector and attach the wire harness clamp.
INSTALL REAR ENGINE MOUNTING INSULATOR
Install the rear engine mounting insulator to the manual transmission assembly with the 4 bolts.
INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
Install the No. 3 frame crossmember sub-assembly with the 4 nuts and 4 bolts.
Install the 4 bolts to the No. 3 frame crossmember sub-assembly.
CONNECT GROUND CABLE
Connect the ground cable with the bolt.
INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
for TMT Made:
for TSAM Made:
INSTALL STIFFENER PLATE LH
Install the stiffener plate LH with the 4 bolts.
INSTALL STIFFENER PLATE RH
Install the stiffener plate RH with the 4 bolts.
INSTALL NO. 4 CYLINDER BLOCK INSULATOR
Install the No. 4 cylinder block insulator.
INSTALL STARTER ASSEMBLY (for 1GD-FTV)
for 2.0 kW Type:
for 2.2 kW Type
for BOSCH Made:
INSTALL STARTER ASSEMBLY (for 2GD-FTV)
for 2.0 kW Type:
for 2.2 kW Type:
for 2.7 kW Type:
for BOSCH Made:
w/ Stop and Start System:
INSTALL UREA TANK SUB-ASSEMBLY (w/ Urea SCR System)
INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 1GD-FTV)
INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2GD-FTV)
ADD MANUAL TRANSMISSION OIL
INSTALL NO. 2 ENGINE UNDER COVER
INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
INSTALL NO. 1 FLOOR SHIFT BUSH
Install the No. 1 floor shift bush to the floor shift shift lever assembly.
INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY
|
MP grease |
Apply MP grease to the tip of the floor shift shift lever assembly.
| *1 | Shift Lever Cap |
| *a | Press Down |
| *b | Clockwise |
| *c | Lock |
Cover the shift lever cap with a cloth.
While pressing down on the shift lever cap, turn it clockwise to install the floor shift shift lever assembly.
Attach the shift lever cap boot.
INSTALL SHIFT LEVER BOOT ASSEMBLY
Install the shift lever boot assembly with the 6 screws and 4 clips.
INSTALL CONSOLE BOX ASSEMBLY (w/ Console Box Lid)
INSTALL FRONT CONSOLE BOX (w/o Console Box Lid)
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.