ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Install 2 new gaskets to the oil bracket sub-assembly.

    2. Install the oil cooler assembly with the 2 bolts and 2 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. CONNECT WATER BY-PASS HOSE


    1. Connect the 2 water by-pass hoses.

  3. ADD ENGINE OIL

    Click here

  4. CHECK ENGINE OIL LEVEL

    Click here

  5. ADD ENGINE COOLANT

    Click here

  6. INSPECT FOR ENGINE OIL LEAK

    Click here

  7. INSPECT FOR COOLANT LEAK

    Click here

  8. INSTALL STRUT BAR BRACKET SUPPORT SUB-ASSEMBLY

    Click here

  9. INSTALL FRONT SUSPENSION MEMBER BRACE

    Click here

  10. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY

    Click here

  11. INSTALL TRANSMISSION UNDER COVER

    Click here

  12. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY

    Click here

  13. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  14. INSTALL LOWER RADIATOR AIR DEFLECTOR

    Click here

  15. INSTALL UPPER RADIATOR SUPPORT SEAL

    Click here

  16. INSTALL RADIATOR COVER PLATE

    Click here