CRUISE CONTROL SYSTEM Cruise Main Indicator Light Circuit

DESCRIPTION


INSPECTION PROCEDURE

PROCEDURE


  1. PERFORM ACTIVE TEST USING INTELLIGENT TESTER


    1. Connect the intelligent tester to the DLC3.

    2. Turn the engine switch on (IG).

    3. Turn the intelligent tester on.

    4. Enter the following menus: Body Electrical / Combination Meter / Active Test.

    5. Check the cruise main indicator light by performing the Active Test.

      Combination Meter
      Tester Display Test Part Control Range Diagnostic Note
      Indicat. Lamp Cruise Cruise main indicator light OFF or BLINK Confirm that the vehicle is stopped with engine idling
      OK
      Cruise main indicator light blinks/goes off.

    NG
    OK
  2. READ VALUE USING INTELLIGENT TESTER


    1. Connect the intelligent tester to the DLC3.

    2. Turn the engine switch on (IG).

    3. Turn the intelligent tester on.

    4. Enter the following menus: Powertrain / Cruise Control / Data List.

    5. Check the Data List for proper functioning of the cruise main indicator light.

      Cruise Control (ECM)
      Tester Display Measurement Item/Range Normal Condition Diagnostic Note
      CCS Indicator M-CPU Cruise indicator signal (Main CPU)/ON or OFF

      ON: Cruise main indicator light on

      OFF: Cruise main indicator light off

      -
      OK
      When the cruise control main switch is operated, the display changes as shown above.
      Result
      Result Proceed to
      OK A
      NG (for 2GR-FE) B
      NG (for 1AR-FE) C

    B
    C
    A