COMBINATION METER INSTALLATION


  1. INSTALL COMBINATION METER ASSEMBLY


    1. Connect the 2 connectors.

    2. Engage the wire harness clamp.

    3. Install the combination meter assembly with the 4 screws.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY


    1. A01EU5W

      Temporarily install the instrument cluster finish panel assembly as shown in the illustration.

    2. Connect each connector.

    3. for LHD:


      1. Engage the 3 claws, 7 clips and 4 guides.

    4. for RHD:


      1. Engage the 4 claws, 5 clips and 4 guides.

    5. A01EWW9

      Engage the 4 clips and 2 guides to install the instrument cluster finish panel assembly.

  3. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY


    1. A01EWEJ

      Engage the 4 clips to install the No. 1 instrument panel register assembly.

  4. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL (for RHD)


    1. w/ Smart Entry and Start System:


      1. Connect the connector.

    2. A01EYSK

      Engage the 2 claws and 4 clips to install the upper instrument panel finish panel.

  5. INSTALL INSTRUMENT SIDE PANEL


    1. Engage the 3 guides.

    2. A01ETDE

      Engage the 4 claws to install the instrument side panel LH as shown in the illustration.

  6. CONNECT FRONT DOOR OPENING TRIM WEATHERSTRIP

    for LHD : Click here

    for RHD : Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for Manual Tilt and Manual Telescopic Steering Column)

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for Power Tilt and Power Telescopic Steering Column)

    Note


    • Reset the auto away/return function setting to the previous condition by changing the customize parameter Click here.

    • When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.