| DTC Code | DTC Name |
|---|---|
| P0562 | System Voltage Low |
DESCRIPTION
The engine stop and start ECU monitors +B terminal voltage while the engine is stopped by stop and start control. If the voltage drops below the specified level, the engine stop and start ECU stores DTC P0562 and blinks the stop and start cancel indicator light.
| DTC No. | DTC Detection Condition | Trouble Area |
|---|---|---|
| P0562 | Both of the following conditions continue for 2 seconds or more (1 trip detection logic):
|
|
Tech Tips
DTCs for the Stop and Start system are not cleared even if the malfunction has been repaired. After repairing the malfunction, be sure to clear the DTCs Click here.
After troubleshooting, perform the following steps to recheck for DTCs and check if the Stop and Start system operates normally.
Tech Tips
If the battery terminal has been disconnected, the stop and start will be prohibited. In this case, drive the vehicle for 15 to 40 minutes to permit the stop and start operation.
Allow the engine to idle for 3 minutes after the engine warms up and check that the engine speed is within 50 rpm of the target idle speed.
Connect the GTS to the DLC3.
Turn the ignition switch to ON and turn the GTS on.
Clear the DTCs Click here.
Start the engine and warm it up.
Drive the vehicle at 7 km/h (4.3 mph) or more.
CAUTION:
When performing the confirmation driving pattern, obey all speed limits and traffic laws.
Stop the vehicle, allow the engine to stop due to stop and start system control and wait for 2 seconds or more (with the shift lever in D).
Release the brake pedal to allow the engine to restart (with the shift lever in D).
Tech Tips
If the engine cranks slowly when the engine is restarted, it can be determined that battery voltage is low.
Check that no DTCs are output Click here.
Check if the Stop and Start system operates normally.
Tech Tips
If the battery terminal has been disconnected, the stop and start will be prohibited. In this case, drive the vehicle for 15 to 40 minutes to permit the stop and start operation.
Warm up the engine.
Turn the air conditioning system off.
Drive the vehicle at 7 km/h (4.3 mph) or more.
CAUTION:
When performing the confirmation driving pattern, obey all speed limits and traffic laws.
Stop the vehicle, allow the engine to stop due to stop and start system control (with the shift lever in D).
Release the brake pedal to allow the engine to restart (with the shift lever in D).
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
If the engine stop and start ECU is being replaced, register the previously recorded number of starter operations into the new engine stop and start ECU Click here.
After the engine stop and start ECU is replaced or after an air conditioner kit is installed, clear the A/C information stored in the engine stop and start ECU Click here.
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
After the engine stop and start ECU or airbag sensor assembly (yaw rate sensor) is replaced, initialize and calibrate 0 point of deceleration sensor Click here.
Tech Tips
Using the GTS, read the freeze frame data before troubleshooting. System condition information is recorded as freeze frame data the moment a DTC is stored. This information can be useful when troubleshooting.
PROCEDURE
READ VALUE USING GTS (BATTERY VOLTAGE)
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Tech Tips
Do not start the engine.
Turn the GTS on.
Turn off all electrical systems.
Enter the following menus: Powertrain / Stop and Start / Data List / Battery Voltage.
Read the battery voltage displayed on the GTS screen.
| Result | Proceed to |
|---|---|
| 4 to 14 V | A |
| Below 4 V | B |
| A |
|
CHECK BATTERY AND CHARGING SYSTEM Click here |
| B |
|
INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN RELAY)
Inspect the No. 1 integration relay Click here.
| NG |
|
REPLACE NO. 1 INTEGRATION RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - BODY GROUND)
Remove the No. 1 integration relay from the engine room main relay block.
Disconnect the No. 1 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ENGINE STOP AND START ECU)
Disconnect the A72 engine stop and start ECU connector.
Remove the No. 1 integration relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| OK |
|
REPLACE ENGINE STOP AND START ECU Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |