| DTC Code | DTC Name |
|---|---|
| Back-up Light Circuit |
INSPECTION PROCEDURE
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK FOR DTC (for HYBRID SYSTEM)
Check for DTCs (Click here).
| OK |
|---|
| DTCs is not output. |
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - AUXILIARY BATTERY AND BODY GROUND)
Disconnect the 1G and 1H No. 1 integration relay connectors.
Measure the voltage and resistance according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - POWER MANAGEMENT CONTROL ECU)
Disconnect the 1G No. 1 integration relay connector.
Disconnect the A19 power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
CHECK HARNESS AND CONNECTOR (REAR COMBINATION LIGHT ASSEMBLY - RELAY AND BODY GROUND)
Disconnect the 1G No. 1 integration relay connector.
Disconnect the V2 or V9 rear combination light assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
REPLACE NO.1 INTEGRATION RELAY
Replace the No. 1 integration relay with a new or a known good one (see pageClick here).
Check that the back-up lights operate normally.
| OK |
|---|
| The back-up lights operate normally. |
END (NO. 1 INTEGRATION RELAY WAS DEFECTIVE)
GO TO HYBRID CONTROL SYSTEMClick here
REPAIR OR REPLACE HARNESS OR CONNECTOR
REPLACE POWER MANAGEMENT CONTROL ECUClick here