ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Install 2 new gaskets to the oil filter bracket sub-assembly.

    2. Install the oil cooler assembly with the 2 bolts and 2 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. CONNECT WATER BY-PASS HOSE


    1. Connect the 2 water by-pass hoses.

  3. ADD ENGINE OIL

    Click here

  4. ADD ENGINE COOLANT

    Click here

  5. INSPECT ENGINE OIL LEVEL

    Click here

  6. INSPECT FOR ENGINE OIL LEAK

    Click here

  7. INSPECT FOR COOLANT LEAK

    Click here

  8. INSTALL INLET NO. 1 AIR CLEANER

    Click here

  9. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  10. INSTALL ENGINE ROOM SIDE COVER

    Click here

  11. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  12. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY

    Click here