CAMSHAFT OIL CONTROL VALVE(for Intake Side of Bank 2) INSTALLATION

PROCEDURE


  1. SET NO. 1 CYLINDER TO TDC/COMPRESSION

    Click here

  2. INSTALL CAMSHAFT TIMING GEAR BOLT


    1. B0073ZJ

      Apply engine oil to the areas of the camshaft timing gear bolt shown in the illustration.

    2. Temporarily install the camshaft timing gear bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Tech Tips

      Make sure that the flange part of the camshaft timing gear bolt is directly contacting the camshaft timing gear assembly.

    3. Loosen the camshaft timing gear bolt 60 to 180°.

    4. Turn the crankshaft pulley clockwise approximately 30 to 90°.

    5. B0076VUN01

      Using SST, hold the crankshaft pulley.

      SST
      09213-54015   ( 91651-60855 )
      09330-00021
    6. Tighten the camshaft timing gear bolt.

      Torque:
      95 N*m  { 969 kgf*cm, 70 ft.*lbf }
  3. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY

    Click here

  4. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY

    Click here