INSTALL TRANSMISSION REVOLUTION SENSOR (NOUT)
Coat a new O-ring with CVT Fluid TC and install it to the transmission revolution sensor.
Install the transmission revolution sensor with the bolt.
Connect the transmission revolution sensor connector.
Connect the engine wire to the wire harness clamp bracket.
Install the engine wire with the bolt.
Install a new gasket to the intake manifold.
Install the throttle body assembly and fuel pipe support with the 4 bolts.
Connect the throttle body connector to the throttle body assembly.
Connect the wire harness clamp to the fuel pipe support bracket.
Install the fuel pipe to the fuel pipe support bracket.
INSTALL TRANSMISSION REVOLUTION SENSOR (NIN)
Coat a new O-ring with CVT Fluid TC and install it to the transmission revolution sensor.
Install the transmission revolution sensor with the bolt.
Connect the transmission revolution sensor connector.
INSTALL TRANSMISSION REVOLUTION SENSOR (NT)
Coat a new O-ring with CVT Fluid TC and install it to the transmission revolution sensor.
Install the transmission revolution sensor with the bolt.
Connect the transmission revolution sensor connector.
INSTALL AIR CLEANER CASE
Install the air cleaner case with the 3 bolts.
Install the engine wire clamp to the air cleaner case.
Install the air cleaner filter element.
INSTALL AIR CLEANER CAP AND HOSE
Install the air cleaner cap sub-assembly with hose and lock the 2 clamps.
| *1 | No. 1 air cleaner hose clamp |
| *2 | Groove |
| *3 | Tab |
| *4 | 95° |
Connect the No. 1 air cleaner hose to the throttle body and release the lock of the No. 1 air cleaner hose clamp.
Note
Align the groove of the air cleaner hose with the tab of the throttle body and install the hose.
Make sure that the tab of the No. 1 air cleaner hose clamp stays within the range shown by *4
Connect the 2 wire harness clamps and the mass air flow meter connector.
Connect the ventilation hose.
Connect the purge line hose to the No. 1 vacuum switching valve assembly and air cleaner hose.
Connect the fuel vapor feed hose to the No. 1 vacuum switching valve assembly.
Connect the wire harness clamp and No. 1 vacuum switching valve connector.
INSTALL BATTERY
Install the battery and battery insulator.
Install the battery clamp with the bolt and nut.
Connect the 2 wire harness clamps.
Connect the positive (+) cable to the positive (+) battery terminal.
INSTALL OUTER COWL TOP PANEL
Install the outer cowl top panel with the 8 bolts.
Connect the 2 clamps to the outer cowl top panel.
Remove the protective tape.
INSTALL BRAKE MASTER CYLINDER RESERVOIR WITH BRACKET
Install the brake master cylinder reservoir with bracket to the outer cowl top panel with the 2 nuts.
INSTALL WINDSHIELD WIPER MOTOR AND LINK
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL RADIATOR COVER SUB-ASSEMBLY
Install the radiator cover sub-assembly with the 4 clips.