Click here

VANE PUMP (for 1UR-FE) INSTALLATION

Click here
Click here Click here
  1. Click here

    INSTALL VANE PUMP ASSEMBLY


    1. Install the vane pump with the 2 bolts.

      21 N*m 214 kgf*cm 15 ft.*lbf
  2. Click here

    CONNECT SUCTION HOSE


    1. Connect the suction hose to the vane pump assembly with the clip.

  3. Click here

    CONNECT PRESSURE FEED TUBE


    1. Install a new gasket to the pressure feed tube.

    2. Connect the pressure feed tube with the union bolt.

      50 N*m 510 kgf*cm 37 ft.*lbf
  4. Click here

    CONNECT POWER STEERING OIL PRESSURE SENSOR CONNECTOR


    1. Connect the connector.

    2. Attach the wire harness clamp.

  5. Click here

    INSTALL FAN AND GENERATOR V BELT


    1. A015BDAE04

      Set the fan and generator V belt onto every part.

      Table 1. Text in Illustration
      *1 Water Pump Pulley
      *2 Fan Pulley
      *3 No. 1 Idler Pulley
      *4 Vane Pump Pulley
      *5 Generator Pulley
      *6 V-ribbed Belt Tensioner
      *7 Crankshaft Pulley
      *8 Cooler Compressor Pulley
    2. While turning the belt tensioner counterclockwise, remove the pin.

      Note:

      Make sure that the fan and generator V belt is properly set on each pulley.

    3. Check that the belt fits properly in the ribbed grooves.

      Tip:

      Make sure to check by hand that the belt has not slipped out of the grooves on the bottom of the pulley.

  6. Click here

    INSTALL AIR CLEANER AND HOSE


    1. Install the air cleaner and hose with the 3 bolts, and then tighten the hose clamp.

      for bolt
      5.0 N*m 51 kgf*cm 44 in.*lbf
      for hose clamp
      2.5 N*m 25 kgf*cm 22 in.*lbf
    2. Attach the clamp and connect the mass air flow meter connector.

    3. Connect the No. 2 PCV hose and No. 1 air hose.

  7. Click here

    INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A015CPLE01

      Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

      Table 2. Text in Illustration
      *1 Grommet
      *2 Pin
      *3 Hook
      *4 Bracket
  8. Click here

    INSTALL FRONT FENDER APRON TRIM PACKING A


    1. w/ KDSS

      Install the front fender apron trim packing B with the 3 clips.

    2. w/o KDSS

      Install the front fender apron trim packing B with the 4 clips.

  9. Click here

    INSTALL FRONT WHEEL RH

    for Aluminum Wheel
    131 N*m 1336 kgf*cm 97 ft.*lbf
    for Steel Wheel
    209 N*m 2131 kgf*cm 154 ft.*lbf
  10. Click here

    ADD POWER STEERING FLUID

  11. Click here

    BLEED POWER STEERING FLUID


    1. Check the fluid level.

    2. Jack up the front of the vehicle and support it with stands.

    3. Turn the steering wheel.


      1. With the engine stopped, turn the wheel slowly from lock to lock several times.

    4. Lower the vehicle.

    5. Start the engine.

    6. Idle the engine for a few minutes.

    7. Turn the steering wheel.


      1. With the engine idling, turn the wheel left or right to the full lock position and keep it there for 2 to 3 seconds, then turn the wheel to the opposite full lock position and keep it there for 2 to 3 seconds. *1

      2. Repeat *1 several times.

        Note:

        For vehicles with VGRS, if the steering wheel is turned from lock to lock repeatedly, the system may stop operating and the amount of rotation before the steering wheel locks may increase due to operation of the overheating prevention function. When the system temperature drops, the system operation automatically returns to normal.

    8. Stop the engine.

    9. A015B9TE03

      Check for foaming or emulsification.

      Table 3. Text in Illustration
      *a Correct
      *b Incorrect

      If the system has to be bled twice because of foaming or emulsification, check for fluid leaks in the system.

    10. Check the fluid level.

  12. Click here

    INSPECT FOR POWER STEERING FLUID LEAK

  13. Click here

    CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).