| DTC Code | DTC Name |
|---|---|
| P0ADF-229 | Hybrid Battery Negative Contactor Control Circuit Low |
DESCRIPTION
Refer to the description for DTC P0AE6-225 (Click here).
| DTC No. | INF Code | DTC Detection Condition | Trouble Area |
|---|---|---|---|
| P0ADF | 229 | Short to GND in the SMRG circuit |
|
CAUTION / NOTICE / HINT
Before inspecting the high-voltage system or disconnecting the low voltage connector of the inverter with converter assembly, take safety precautions such as wearing insulated gloves and removing the service plug grip to prevent electrical shocks. After removing the service plug grip, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work (Click here).
Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.
After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work (Click here).
If P0ADF-229 is stored, the vehicle cannot be started.
PROCEDURE
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)
Disconnect the H1 power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| *a | Rear view of wire harness connector (to Power Management Control ECU) |
Reconnect the H1 power management control ECU connector.
REPLACE POWER MANAGEMENT CONTROL ECU (Click here)
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - HYBRID BATTERY JUNCTION BLOCK ASSEMBLY)
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the No. 4 hybrid battery shield panel (Click here).
Disconnect the Q6 hybrid battery junction block assembly connector.
Disconnect the H1 power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| *a | Rear view of wire harness connector (to Power Management Control ECU) |
| *b | Rear view of wire harness connector (to Hybrid Battery Junction Block Assembly) |
Reconnect the H1 power management control ECU connector.
Reconnect the Q6 hybrid battery junction block assembly connector.
Install the No. 4 hybrid battery shield panel.
REPLACE HYBRID BATTERY JUNCTION BLOCK ASSEMBLY (Click here)
REPAIR OR REPLACE HARNESS OR CONNECTOR