OIL PUMP INSTALLATION

Click here
Click here Click here

CAUTION / NOTICE / HINT

Note:
  • When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.

    Replaced Parts (A) Pipes Requiring New Replacement

    • Injector assembly (including shuffling the injector assemblies between the cylinders)

    • Common rail assembly

    • Cylinder head sub-assembly


    • No. 1 injection pipe sub-assembly

    • No. 2 injection pipe sub-assembly

    • No. 3 injection pipe sub-assembly

    • No. 4 injection pipe sub-assembly


    • Supply pump assembly

    • Common rail assembly

    • Cylinder block sub-assembly

    • Cylinder head sub-assembly

    • Cylinder head gasket

    • Timing Gear Case Assembly

    Fuel inlet pipe sub-assembly
  • After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and fuel inlet pipe sub-assembly, clean them with a brush and compressed air.

Click here

PROCEDURE


  1. Click here

    INSTALL TIMING GEAR CASE ASSEMBLY

    Click here

  2. Click here

    INSTALL OIL STRAINER SUB-ASSEMBLY

    Click here

  3. Click here

    INSTALL OIL PAN SUB-ASSEMBLY

    Click here

  4. Click here

    INSTALL FUEL SUPPLY PUMP ASSEMBLY

    Click here

  5. Click here

    INSTALL INJECTION GEAR

    Click here

  6. Click here

    INSTALL CRANKSHAFT TIMING GEAR

    Click here

  7. Click here

    INSTALL NO. 1 IDLE GEAR SHAFT

    Click here

  8. Click here

    INSTALL NO. 1 IDLE GEAR

    Click here

  9. Click here

    INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE

    Click here

  10. Click here

    INSTALL TIMING GEAR COVER

    Click here

  11. Click here

    INSTALL CRANKSHAFT PULLEY SUB-ASSEMBLY

    Click here

  12. Click here

    INSTALL PUMP DRIVE SHAFT PULLEY


    1. Install a new O-ring to the fuel supply pump assembly.

    2. Temporarily install the fuel supply pump assembly with the nut.

    3. B00259KC01
      *a Hold
      B0068HS Turn

      Using SST, hold the crankshaft pulley and tighten the nut.

      09213-58014 91551-80840
      09330-00021
      63.7 N*m 650 kgf*cm 47 ft.*lbf
    4. Install the No. 2 camshaft timing pulley flange and pump drive shaft pulley to the timing gear cover with the 4 bolts.

      31 N*m 316 kgf*cm 23 ft.*lbf
    5. B00289Z

      Using a dial indicator, check the thrust clearance of the pump drive shaft while moving the pump drive shaft pulley back and forth.

      Standard thrust clearance (reference)
      0.15 to 0.55 mm (0.00591 to 0.0217 in.)
      Tip:

      If there is no clearance, remove and reinstall the fuel supply pump assembly and pump drive shaft pulley. Then repeat the step above.

  13. Click here

    INSTALL CRANKSHAFT POSITION SENSOR

    Click here

  14. Click here

    INSTALL CAMSHAFT POSITION SENSOR

    Click here

  15. Click here

    INSTALL VANE PUMP ASSEMBLY

    Click here

  16. Click here

    INSTALL VACUUM PUMP ASSEMBLY

    Click here

  17. Click here

    INSTALL ENGINE WATER PUMP ASSEMBLY

    Click here

  18. Click here

    INSTALL NO. 2 TIMING BELT COVER

    Click here

  19. Click here

    INSTALL CAMSHAFT TIMING PULLEY

    Click here

  20. Click here

    INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

    Click here

  21. Click here

    INSTALL FUEL INLET PIPE SUB-ASSEMBLY

    Click here

  22. Click here

    INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

    Click here

  23. Click here

    INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY

    Click here

  24. Click here

    INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY

    Click here

  25. Click here

    INSTALL MANIFOLD STAY

    Click here

  26. Click here

    INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET

    Click here

  27. Click here

    INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

    Click here

  28. Click here

    INSTALL GENERATOR BRACKET

    Click here

  29. Click here

    INSTALL GENERATOR ASSEMBLY

    Click here

  30. Click here

    INSTALL NO. 2 IDLE PULLEY ASSEMBLY

    Click here

  31. Click here

    INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY

    Click here

  32. Click here

    INSTALL TIMING BELT

    Click here

  33. Click here

    INSTALL NO. 1 TIMING BELT COVER

    Click here

  34. Click here

    INSTALL ENGINE ASSEMBLY

    Click here

  35. Click here

    ADD ENGINE OIL

    Click here

  36. Click here

    CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  37. Click here

    BLEED AIR FROM FUEL SYSTEM

    Click here

  38. Click here

    ADD ENGINE COOLANT

    Click here

  39. Click here

    BLEED AIR FROM POWER STEERING SYSTEM

    Click here

  40. Click here

    INSPECT FOR POWER STEERING FLUID LEVEL

    Click here

  41. Click here

    PERFORM REGISTRATION


    1. Perform registration of the injector compensation codes.

      Click here

    2. Perform pilot quantity learning.

      Click here

  42. Click here

    INSPECT FOR OIL LEAK

    Click here

  43. Click here

    INSPECT FOR COOLANT LEAK

    Click here

  44. Click here

    INSPECT FOR EXHAUST GAS LEAK

    Click here

  45. Click here

    INSPECT FOR FUEL LEAK

    Click here

  46. Click here

    INSPECT ENGINE OIL LEVEL

    Click here