HEADLIGHT LEVELING ECU INSTALLATION

PROCEDURE


  1. INSTALL HEADLIGHT LEVELING ECU ASSEMBLY


    1. Install the headlight leveling ECU assembly with the nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the connector.

  2. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY

    Click here

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  4. INSTALL NO. 1 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY

    Click here

  5. INSTALL INSTRUMENT PANEL REGISTER BEZEL GARNISH

    Click here

  6. INSTALL LOWER STEERING COLUMN COVER

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  8. PERFORM DIAGNOSTIC SYSTEM CHECK

    Click here

  9. CHECK SRS WARNING LIGHT

    Click here

  10. PERFORM INITIALIZATION

    Click here