STEERING GEAR INSTALLATION

PROCEDURE


  1. ADJUST TIE ROD END SUB-ASSEMBLY


    1. B003NAOE01

      Adjust the tie rod end sub-assembly LH and RH so that distance A is within the specified ranges.

      Standard Length (A)
      17 mm (0.6693 in.) or less

      CAUTION:

      Make sure to tighten the nut in the alignment adjustment procedure.

      Note

      Make sure that the boots are not twisted.

      Tech Tips


      • The values listed above are reference values.

      • The toe-in is adjusted in another step.

  2. INSTALL POWER STEERING LINK ASSEMBLY


    1. Install the power steering link assembly with the 2 bolts, 2 washers and 2 nuts.

      Torque:
      130 N*m  { 1326 kgf*cm, 96 ft.*lbf }
    2. B003M54C01
      *a Torque Wrench Fulcrum Length

      Using a union nut wrench, connect the steering gear outlet return tube.

      Torque:
      Specified tightening torque
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }

      Tech Tips


      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Click here

      • When using a union nut wrench (fulcrum length of 30 mm (1.1811 in.)) + torque wrench (fulcrum length of 180 mm (7.0866 in.)): 21.4 N*m (218 kgf*cm, 16 ft.*lbf)

    3. Install the hose with the clip.

    4. Install the pressure feed tube assembly bracket to the power steering link assembly with the bolt.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
    5. B003K3BC01
      *a Torque Wrench Fulcrum Length

      Using a union nut wrench, tighten the flare nut and connect the pressure feed tube assembly.

      Torque:
      Specified tightening torque
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }

      Tech Tips


      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Click here

      • When using a union nut wrench (fulcrum length of 30 mm (1.1811 in.)) + torque wrench (fulcrum length of 180 mm (7.0866 in.)): 21.4 N*m (218 kgf*cm, 16 ft.*lbf)

  3. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY

    Click here

  4. CONNECT NO. 2 STEERING INTERMEDIATE SHAFT SUB-ASSEMBLY


    1. Align the matchmarks on the No. 2 steering intermediate shaft sub-assembly and power steering link assembly.

    2. Install the bolt.

      Torque:
      35 N*m  { 357 kgf*cm, 26 ft.*lbf }
  5. CONNECT STEERING SLIDING YOKE


    1. B003MO3C01
      *a Matchmark
      B003OFB Install in this Direction

      Align the matchmarks on the steering sliding yoke and No. 2 steering intermediate shaft, and connect the steering sliding yoke to the No. 2 steering intermediate shaft sub-assembly.

    2. B003PWVN02

      Install the bolt labeled B.

      Torque:
      35 N*m  { 357 kgf*cm, 26 ft.*lbf }
    3. Tighten the bolt labeled A.

      Torque:
      35 N*m  { 357 kgf*cm, 26 ft.*lbf }
  6. CONNECT TIE ROD END SUB-ASSEMBLY LH


    1. Connect the tie rod end sub-assembly LH to the front axle hub assembly with a new nut.

      Torque:
      91 N*m  { 928 kgf*cm, 67 ft.*lbf }
    2. Install a new cotter pin.

      Note

      If the holes for the cotter pin are not aligned, tighten the nut an additional 60°.

  7. CONNECT TIE ROD END SUB-ASSEMBLY RH

    Tech Tips

    Use the same procedure described for the LH side.

  8. INSTALL NO. 2 ENGINE UNDER COVER

    Click here

  9. INSTALL NO. 1 NGINE UNDER COVER ASSEMBLY

    Click here

  10. INSTALL FRONT WHEELS

    Click here

  11. ADD POWER STEERING FLUID

  12. ADJUST POWER STEERING FLUID

    Click here

  13. CHECK FOR POWER STEERING FLUID LEAK

  14. ADJUST FRONT WHEEL ALIGNMENT

    Click here