AUTOMATIC HIGH BEAM MAIN SWITCH INSTALLATION

PROCEDURE


  1. INSTALL AUTOMATIC HIGH BEAM MAIN SWITCH ASSEMBLY (NO. 2 COMBINATION SWITCH ASSEMBLY)


    1. A01VCEPC01
      B004PI4 Install in this Direction

      Engage the 2 claws to install the automatic high beam main switch assembly (No. 2 combination switch assembly) as shown in the illustration.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY

    Click here