STARTER INSTALLATION

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. Type B:


      1. A0026W0C02
        *a 26.5 mm (1.043 in.)
        *b 18 mm (0.709 in.)
        *c 50 mm (1.969 in.)

        Using an E8 "TORX" socket wrench, install the 2 stud bolts to the automatic transaxle assembly.

        Torque:
        37 N*m  { 377 kgf*cm, 27 ft.*lbf }
      2. Install the starter assembly with the 2 nuts.

        Torque:
        37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    2. Type A:


      1. Install the starter assembly with the 2 bolts.

        Torque:
        37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    3. Connect terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Close the terminal cap.

    5. Connect the starter assembly connector.

  2. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

    Click here

  3. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  4. INSTALL BATTERY

    Click here

  5. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  6. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  7. INSTALL RADIATOR SIDE SEAL RH

    Click here

  8. INSTALL RADIATOR SIDE DEFLECTOR SEAL LH

    Click here

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here