ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  2. INSTALL ECM BRACKET


    1. Install the ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  3. INSTALL ECM


    1. Install the ECM with the 3 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    2. Engage the clamp to install the wire harness.

    3. A0029I9

      Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

      • Be sure to securely connect the ECM connectors.

  4. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

    Click here

  5. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  6. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  7. INSTALL RADIATOR SIDE SEAL RH

    Click here

  8. INSTALL RADIATOR SIDE DEFLECTOR SEAL LH

    Click here

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  10. PERFORM INITIALIZATION

    Click here