КЛАПАН ПРОДУВКИ АДСОРБЕРА УСТАНОВКА

PROCEDURE


  1. INSTALL PURGE VSV


    1. Install the purge VSV with the screw.

      Torque:
      3.4 N*m  { 35 kgf*cm, 30 in.*lbf }
    2. Connect the fuel vapor feed hose and No. 2 fuel vapor feed hose to the purge VSV, and slide the 2 clamps to secure it.

    3. Connect the purge VSV connector.

  2. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here