ECM УСТАНОВКА

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  3. INSTALL ECM


    1. Install the ECM with the 3 bolts.

      Torque:
      6.5 N*m  { 66 kgf*cm, 58 in.*lbf }
    2. A01V6WP

      Connect the 2 ECM connectors and move the 2 levers as shown in the illustration.

      Note


      • When connecting a connector, make sure that dirt, water and other foreign matter is not stuck between the connector and ECM.

      • Make sure that the 2 levers are in the positions shown in the illustration.

  4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. Install the air cleaner case sub-assembly with the 3 bolts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. Attach the wire harness clamp to the air cleaner case sub-assembly.

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  6. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  8. PERFORM INITIALIZATION

    Click here

  9. RESET MEMORY (for CVT)


    1. When replacing the ECM, perform the Reset Memory procedure (initialization).

      Click here