GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the wire harness clamp bracket with the bolt.

      Torque:
      7.7 N*m  { 79 kgf*cm, 68 in.*lbf }
    2. Temporarily install the generator assembly and No. 2 generator bracket with the 3 bolts.

    3. A01V6QBC01
      A01V9RL Bolt A
      A01V8SA Bolt B

      Tighten the 3 bolts in the order shown in the illustration to install the generator assembly and No. 2 generator bracket.

      Torque:
      for bolt A
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
      for bolt B
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
    4. Connect the wire harness to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    5. Install the terminal cap.

    6. Connect the connector and attach the wire harness clamp.

  2. INSTALL V-RIBBED BELT

    Click here

  3. INSPECT V-RIBBED BELT

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  5. INSTALL REAR ENGINE UNDER COVER RH

    Click here

  6. INSTALL NO. 1 ENGINE UNDER COVER

    Click here

  7. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here