HEATER EXHAUST PIPE(w/ Combustion Type Power Heater) INSTALLATION

PROCEDURE


  1. INSTALL HEAT EXCHANGER UNIT GASKET

    Click here

  2. INSTALL NO. 2 EXHAUST PIPE SUB-ASSEMBLY


    1. A002Q8J

      Install the No. 2 exhaust pipe sub-assembly with the 2 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  3. INSTALL HEATER WITH EXHAUST PIPE ASSEMBLY

    Click here

  4. INSTALL NO. 1 EXHAUST PIPE SUB-ASSEMBLY


    1. A002N7TE02

      Install the No. 1 exhaust pipe sub-assembly with the 2 nuts labeled <A>.

      Torque:
      7.5 N*m  { 77 kgf*cm, 66 in.*lbf }
    2. Install the nut labeled <B>.

      Torque:
      7.5 N*m  { 77 kgf*cm, 66 in.*lbf }
  5. INSTALL AIR DUCT

    Click here

  6. INSTALL OUTER COWL TOP PANEL

    Click here

  7. INSTALL DIFFERENTIAL PRESSURE SENSOR ASSEMBLY (for DPF)

    Click here

  8. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY

    Click here

  9. INSTALL COWL TOP VENTILATOR LOUVER LH

    Click here

  10. INSTALL COWL TOP VENTILATOR LOUVER RH

    Click here

  11. INSTALL HOOD TO COWL TOP SEAL

    Click here

  12. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH

    Click here

  13. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH

    Click here

  14. INSTALL FRONT WIPER ARM HEAD CAP

    Click here

  15. INSTALL NO. 1 ENGINE COVER

    Click here