ECM INSTALLATION

PROCEDURE


  1. INSTALL ECM


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    3. Install the ECM with bracket with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    4. A002O4D

      Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connector, make sure that dirt, water or other foreign matter is not stuck between the ECM connector and ECM.

      • Make sure that the 2 levers are securely lowered.

  2. CONNECT NO. 1 AIR CLEANER INLET


    1. Connect the No. 1 air cleaner inlet with the bolt.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH AIR CLEANER HOSE ASSEMBLY

    Click here

  6. INSTALL RADIATOR SUPPORT OPENING COVER

    Click here

  7. INSTALL NO. 1 ENGINE COVER

    Click here

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  9. PERFORM REGISTRATION

    Click here

  10. PERFORM INITIALIZATION

    Click here