STEERING LINKAGE INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedure for RHD and LHD vehicles.

  • The procedure listed below is for LHD vehicles.

PROCEDURE


  1. INSTALL POWER STEERING LINK ASSEMBLY


    1. A000Q43E06
      Text in Illustration
      *1 No. 1 Steering Rack Housing Bracket

      Install the power steering link assembly with the 2 bolts, No. 1 steering rack housing bracket, and 2 nuts.

      Torque:
      118 N*m  { 1199 kgf*cm, 87 ft.*lbf }
    2. Connect the wire harness connectors to the power steering link assembly.

  2. CONNECT TIE ROD ASSEMBLY LH


    1. Connect the tie rod assembly LH to the steering knuckle with the nut.

      Torque:
      65 N*m  { 663 kgf*cm, 48 ft.*lbf }

      Note

      If the holes for the clip are not aligned, tighten the nut up to an additional 60°.

    2. Install a new clip.

  3. CONNECT TIE ROD ASSEMBLY RH

    Tech Tips

    Use the same procedure described for the LH side.

  4. INSTALL NO. 2 FRONT SUSPENSION MEMBER UPPER

    Click here

  5. CONNECT STEERING SLIDING WITH SHAFT YOKE SUB-ASSEMBLY (w/o VGRS)


    1. A000N0XE02
      Text in Illustration
      *a Matchmark
      *b Vehicle Interior

      Align the matchmark on the steering sliding with shaft yoke with the matchmark on the power steering link and install the bolt.

      Torque:
      35 N*m  { 360 kgf*cm, 26 ft.*lbf }
    2. Tighten the bolt closest to the vehicle interior.

      Torque:
      35 N*m  { 360 kgf*cm, 26 ft.*lbf }
  6. CONNECT STEERING SLIDING WITH SHAFT YOKE SUB-ASSEMBLY (w/ VGRS)

    Click here

  7. INSTALL FRONT SUSPENSION MEMBER PROTECTOR LOWER

    Click here

  8. INSTALL NO. 2 ENGINE UNDER COVER

    Click here

  9. INSTALL FRONT SUSPENSION MEMBER BRACE

    Click here

  10. INSTALL REAR ENGINE UNDER COVER LH

    Click here

  11. INSTALL REAR ENGINE UNDER COVER RH

    Click here

  12. INSTALL ENGINE UNDER COVER

    Click here

  13. INSTALL FRONT WHEELS

    Click here

  14. PLACE FRONT WHEELS FACING STRAIGHT AHEAD

  15. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Click here

  16. INSTALL LUGGAGE COMPARTMENT TRIM COVER LH

    Click here

  17. INSTALL LUGGAGE COMPARTMENT FLOOR MAT

    Click here

  18. ADJUST FRONT WHEEL ALIGNMENT

    Click here

  19. PERFORM POWER STEERING CALIBRATION

    Click here

  20. VARIABLE GEAR RATIO STEERINGSYSTEM CALIBRATION (w/ VGRS)

    Click here

  21. PERFORM INITIALIZATION (w/ VGRS)

    Click here