VOLTAGE INVERTER INSTALLATION

PROCEDURE


  1. INSTALL VOLTAGE INVERTER ASSEMBLY


    1. for 2AR-FSE:


      1. A000Q5WE02

        Set the voltage inverter assembly in place.

      2. Temporarily install the 2 nuts.

      3. Tighten the 2 nuts in the order shown in the illustration.

        Torque:
        8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      4. Connect the connector and attach the clamp.

    2. for 2GR-FXE:


      1. A000R6WE02

        Set the voltage inverter assembly in place.

      2. Temporarily install the 2 nuts.

      3. Tighten the 2 nuts in the order shown in the illustration.

        Torque:
        8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      4. Connect the wire harness with the bolt.

      5. Connect the connector.

  2. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER

    Click here

  3. INSTALL REAR LUGGAGE COMPARTMENT TRIM COVER

    Click here

  4. INSTALL NO. 1 LUGGAGE COMPARTMENT LIGHT ASSEMBLY

    Click here

  5. INSTALL NO. 1 LUGGAGE COMPARTMENT TRIM HOOK

    Click here

  6. INSTALL LUGGAGE COMPARTMENT TRIM BOX (w/o Spare Tire)

    Click here

  7. INSTALL LUGGAGE COMPARTMENT FLOOR MAT

    Click here