CAUTION / NOTICE / HINT
CAUTION:
As the engine assembly with transmission is extremely heavy, the engine lifter may suddenly drop if the instructions listed in the repair manual are not followed. Therefore, always follow the instructions listed in the repair manual when performing this procedure.
PROCEDURE
INSTALL IGNITION COIL
INSTALL KNOCK SENSOR
INSTALL ENGINE COOLANT TEMPERATURE SENSOR
INSTALL ENGINE OIL LEVEL SENSOR
INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
INSTALL WATER INLET HOUSING
INSTALL WATER PUMP PULLEY
INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Install the bolt and No. 1 idler pulley sub-assembly.
Tech Tips
Install the No. 1 idler pulley sub-assembly in the direction shown in the illustration.
| *1 | Front |
INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
Install the bolt and No. 2 idler pulley sub-assembly.
INSTALL NO. 4 ENGINE COVER SUB-ASSEMBLY
Install the No. 4 engine cover sub-assembly.
INSTALL ENGINE WIRE
Install the engine wire with the bolt.
Connect the 4 knock sensor connectors.
INSTALL SEPARATOR CASE
INSTALL FUEL INJECTOR ASSEMBLY
INSTALL FUEL DELIVERY PIPE
INSTALL FUEL TUBE SUB-ASSEMBLY
INSTALL NO. 2 ENGINE COVER SUB-ASSEMBLY LH
INSTALL NO. 3 ENGINE COVER
INSTALL INTAKE MANIFOLD
INSTALL THROTTLE BODY ASSEMBLY
INSTALL VENTILATION HOSE
INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
Install the front No. 1 engine mounting bracket RH with the 6 bolts.
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
Install the front No. 1 engine mounting bracket LH with the 6 bolts.
INSTALL ENGINE MOUNTING DAMPER
Install the 2 engine mounting dampers with the 2 nuts.
INSTALL GENERATOR ASSEMBLY
INSTALL FRONT ENGINE MOUNTING INSULATOR
Tech Tips
Perform this procedure only when replacement of the front engine mounting insulator is necessary.
Install the 2 front engine mounting insulators with the 2 nuts.
INSTALL ENGINE MOUNTING SPACER
Install the 2 engine mounting spacers to the engine mounting insulator.
INSTALL NO. 1 ENGINE HANGER
REMOVE ENGINE STAND
Lift the engine and remove it from the engine stand.
Note
With the exception of installing the engine assembly to an engine stand or removing the engine assembly from an engine stand, do not perform any work on the engine while it is suspended, as doing so is dangerous.
Place the engine onto a work bench.
INSTALL FRONT SUSPENSION CROSSMEMBER SUB-ASSEMBLY
Install the front suspension crossmember sub-assembly with the 2 nuts.
INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
Using SST, hold the crankshaft.
| *1 | Pin Hole |
| *2 | Pin |
| *3 | Front Side |
Install the crankshaft angle sensor rotor.
Tech Tips
Align the pin of the crankshaft with the pin hole of the crankshaft angle sensor rotor.
As the crankshaft angle sensor rotor are not reversible, be sure to install it in the direction shown in the illustration.
| *1 | Drive Plate |
| *2 | Front Side |
| *3 | Spacer Plate |
Install the drive plate and ring gear sub-assembly and spacer plate on to the crankshaft.
Tech Tips
As the drive plate and ring gear sub-assembly and spacer plate are not reversible, be sure to install it in the direction shown in the illustration.
Uniformly install and tighten 10 new bolts in the sequence shown in the illustration.
Note
Do not reuse the drive plate installation bolts.
Do not impact or damage the drive plate installation bolts. Be sure to handle them carefully.
Mark the upside of each drive plate installation bolt with paint.
Retighten the drive plate installation bolts by 90°.
Check that the painted marks are now at a 90° angle to the upside.
INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
INSTALL DRIVE PLATE AND TORQUE CONVERTER SETTING BOLT
INSTALL STARTER ASSEMBLY
INSTALL ENGINE WIRE
Install the engine wire with the 4 nuts.
Connect the clamp and 2 clamp brackets with the 2 bolts.
Connect the intake air control valve actuator connector.
Connect the No. 1 vacuum switching valve connector.
Connect the throttle body connectors.
for Engine RH Side:
Connect the 2 clamps and install the 3 clamp brackets with the 3 bolts.
Connect the engine oil level sensor connector.
Connect the crankshaft position sensor connector.
Connect the starter connector and starter wire with the nut.
Connect the generator connector and generator wire with the nut.
Connect the camshaft position sensor connector.
Connect the engine wire connector.
Connect the 2 camshaft timing control motor connectors. (for Bank 2)
Connect the 2 VVT sensor connectors.
Connect the 4 ignition coil connectors.
Connect the camshaft timing control valve connector.
for Engine LH Side:
Install the clamp bracket with the bolt.
Connect the 3 clamps and 3 ground wires with the 3 bolts.
Connect the 2 camshaft timing control motor connectors. (for Bank 1)
Connect the oil pressure switch connector.
Connect the engine coolant temperature sensor connector.
Connect the clamp and install the 2 clamp brackets with the 2 bolts.
Connect the No. 8 engine wire connector.
Connect the 2 VVT sensor connectors.
Connect the 4 ignition coil connectors.
Connect the camshaft timing control valve connector.
INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR
INSTALL OIL COOLER TUBE
INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY (for Bank 2)
INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
Apply a light coat of engine oil to a new O-ring.
Install the new O-ring to the engine oil level dipstick guide.
Install the engine oil level dipstick guide with the 2 bolts.
Install the engine oil level dipstick.
INSTALL ENGINE AND TRANSMISSION
Place the engine on an engine lifter.
Note
Place wooden blocks or plate lift attachments so that the engine is level.
With the exception of installing the engine assembly to an engine stand or removing the engine assembly from an engine stand, do not perform any work on the engine while it is suspended, as doing so is dangerous.
Never install attachments to the oil pan of the engine assembly or transmission as doing so may deform the oil pan.
Remove the 2 bolts and 2 engine hangers.
Operate the engine lifter, then install the engine to the vehicle.
Note
Make sure that the engine is clear of all wiring and hoses.
Align the crossmember to the marks on the vehicle, and temporarily install the engine and transmission with crossmember with the 4 bolts.
Note
Make sure the crossmember is aligned to the vehicle marks as accurately as possible. If not performed accurately, the suspension alignment may become extremely misaligned.
Tighten the 4 bolts.
Install the 6 engine rear mounting member's bolts.
CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
CONNECT FRONT NO. 2 LOWER SUSPENSION ARM ASSEMBLY
CONNECT COOLER COMPRESSOR ASSEMBLY
Connect the cooler compressor assembly with the 2 stud bolts, 2 nuts and 2 bolts.
INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY (for Bank 1)
INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
INSTALL POWER STEERING LINK ASSEMBLY (w/ VGRS)
INSTALL POWER STEERING LINK ASSEMBLY (w/o VGRS)
INSTALL NO. 2 STEERING INTERMEDIATE SHAFT ASSEMBLY
INSTALL STEERING SLIDING YOKE WITH SHAFT SUB-ASSEMBLY (w/ VGRS)
INSTALL STEERING SLIDING YOKE WITH SHAFT SUB-ASSEMBLY (w/o VGRS)
INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT LH
INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT RH
INSTALL FRONT STABILIZER BAR
INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY
INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET SUB-ASSEMBLY
INSTALL FRONT EXHAUST PIPE ASSEMBLY
CONNECT HOSES AND CONNECTORS
Connect the purge line hose.
Connect the 2 heater hoses.
Connect the wires with No. 1 engine room junction block with the 2 nuts.
Connect the ground wire with the bolt.
Connect the 3 connectors with front controller with the clamp.
Attach the clamp and connect the cooler compressor connector.
Connect the 3 TCM connectors and 4 ECM connectors.
Install the ECM box cover (upper).
CONNECT NO. 3 FUEL HOSE
INSTALL ENGINE ROOM ECU OUTLET DUCT
Install the engine room ECU outlet duct.
CONNECT NO. 2 RADIATOR HOSE
CONNECT NO. 1 RADIATOR HOSE
INSTALL AIR CLEANER ASSEMBLY RH
INSTALL AIR CLEANER ASSEMBLY LH
INSTALL V-RIBBED BELT
INSTALL INTAKE AIR CONNECTOR PIPE
INSTALL NO. 1 AIR CLEANER INLET
INSTALL REAR FRAME SIDE RAIL
Install the 2 rear frame side rails with the 6 bolts and 4 nuts.
INSTALL FRONT SUSPENSION LOWER CROSSMEMBER
INSTALL FRONT BUMPER COVER
CONNECT NO. 1 OIL COOLER OUTLET HOSE
CONNECT NO. 1 OIL COOLER INLET HOSE
ADD ENGINE OIL
ADD ENGINE COOLANT
ADD AUTOMATIC TRANSMISSION FLUID
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSPECT FOR OIL LEAK
INSPECT FOR COOLANT LEAK
INSPECT FOR FUEL LEAK
INSPECT FOR EXHAUST GAS LEAK
PLACE FRONT WHEELS FACING STRAIGHT AHEAD
CHECK AND ADJUST FRONT WHEEL ALIGNMENT
CHECK SHIFT LEVER POSITION
INSTALL FRONT SUSPENSION MEMBER PROTECTOR LOWER
Install the front suspension member protector lower with the 8 bolts.
INSTALL NO. 2 ENGINE UNDER COVER
Install the No. 2 engine under cover with the 8 bolts.
INSTALL NO. 1 ENGINE UNDER COVER
CHECK IGNITION TIMING
CHECK IDLE SPEED
CHECK CO/HC
CHECK ENGINE OIL LEVEL
INSTALL ENGINE ROOM SIDE COVER RH
INSTALL ENGINE ROOM SIDE COVER LH
INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY
INSTALL V-BANK COVER SUB-ASSEMBLY
INSTALL COWL TOP VENTILATOR LOUVER RH