ECM УСТАНОВКА

PROCEDURE


  1. INSTALL ECM

    A001AT9

    1. Install the ECM with the 2 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Connect the 6 ECM connectors.

  2. INSTALL TCM

    A0019VZ

    1. Install the TCM with the 2 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Connect the 4 TCM connectors.

  3. INSTALL ENGINE ROOM ECU COVER

    A001EJ1

    1. Install the engine room ECU cover with the 3 bolts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
  4. INSTALL ENGINE ROOM SIDE COVER LH

    Click here

  5. INSTALL AIR CLEANER INLET COVER

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  7. INSTALL COWL TOP VENTILATOR LOUVER RH

    Click here

  8. PERFORM RESET MEMORY

    Note

    Perform the RESET MEMORY (AT initialization) when replacing the automatic transmission assembly, engine assembly or ECM Click here.

    Tech Tips

    Initialization cannot be completed by only removing the battery.