PROCEDURE
INSTALL VOLTAGE INVERTER ASSEMBLY
Install the voltage inverter with the 2 bolts.
Connect the connector.
INSTALL DECK TRIM SIDE PANEL ASSEMBLY RH
INSTALL ASSIST GRIP SUB-ASSEMBLY (w/ Rear No. 2 Seat)
INSTALL ASSIST GRIP PLUG (w/ Rear No. 2 Seat)
INSTALL FRONT DECK SIDE TRIM COVER (w/ Tonneau Cover)
INSTALL NO. 1 TONNEAU COVER HOLDER CAP (w/o Tonneau Cover)
INSTALL NO. 1 LUGGAGE COMPARTMENT TRIM HOOK
INSTALL REAR NO. 1 SEAT OUTER LAP BELT ANCHOR COVER
INSTALL REAR FLOOR CARPET ASSEMBLY (w/o Rear No. 2 Seat)
INSTALL FLOOR SIDE RAIL RH (w/ Deck Rail)
INSTALL FLOOR SIDE RAIL LH (w/ Deck Rail)
INSTALL REAR FLOOR MAT REAR SUPPORT PLATE (w/o Rear No. 2 Seat)
INSTALL NO. 1 DECK BOARD SUB-ASSEMBLY (w/o Rear No. 2 Seat)
INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER (w/o Rear No. 2 Seat)
INSTALL TONNEAU COVER ASSEMBLY (w/ Tonneau Cover)
INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP RH
INSTALL REAR DOOR SCUFF PLATE RH
INSTALL QUARTER SCUFF PLATE RH (w/ Rear No. 2 Seat)
INSTALL REAR NO. 1 FLOOR STEP COVER (w/ Rear No. 2 Seat)