TCM INSTALLATION

PROCEDURE


  1. INSTALL TCM


    1. Install the TCM with the 2 nuts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 3 connectors.

  2. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY (w/ Knee Airbag)

    Click here

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY

    Click here

  4. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY (for LHD)

    Click here

  5. INSTALL INSTRUMENT PANEL FINISH PLATE GARNISH (for RHD)

    Click here

  6. INSTALL INSTRUMENT SIDE PANEL LH (for LHD)

    Click here

  7. INSTALL INSTRUMENT SIDE PANEL RH (for RHD)

    Click here

  8. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  9. INSTALL COWL SIDE TRIM BOARD LH (for LHD)

    Click here

  10. INSTALL COWL SIDE TRIM BOARD RH (for RHD)

    Click here

  11. INSTALL DOOR SCUFF PLATE ASSEMBLY LH (for LHD)

    Click here

  12. INSTALL DOOR SCUFF PLATE ASSEMBLY RH (for RHD)

    Click here

  13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  14. CHECK SRS WARNING LIGHT


    1. Check the SRS warning light Click here.