BATTERY CURRENT SENSOR INSTALLATION

PROCEDURE


  1. INSTALL GROUND WIRE (BATTERY CURRENT SENSOR)


    1. A001AYOE01
      Text in Illustration
      *1 Bolt A
      *2 Bolt B

      for LHD:


      1. Install the ground wire (battery current sensor) with the 2 bolts A.

        Torque:
        11.5 N*m  { 117 kgf*cm, 8 ft.*lbf }
      2. Install the bolt B to connect the ground wire harness to the ground wire (battery current sensor).

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      3. Connect the connector.

    2. A001AA7E01
      Text in Illustration
      *1 Bolt A
      *2 Bolt B

      for RHD:


      1. Install the ground wire (battery current sensor) with the 2 bolts A.

        Torque:
        11.5 N*m  { 117 kgf*cm, 8 ft.*lbf }
      2. Install the bolt B to connect the ground wire harness to the ground wire (battery current sensor).

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      3. Connect the connector.

  2. INSTALL FRONT FENDER UPPER PROTECTOR RH (for LHD)

    Click here

  3. REMOVE FRONT FENDER UPPER PROTECTOR LH (for RHD)

    Click here

  4. INSTALL ENGINE ROOM SIDE COVER RH (for LHD)

    Click here

  5. REMOVE ENGINE ROOM SIDE COVER LH (for RHD)

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  7. INSTALL COWL TOP VENTILATOR LOUVER

    Click here