NETWORK GATEWAY ECU(for RHD) INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips

A bolt without a torque specification is shown in the standard bolt chart Click here.

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. Install the network gateway ECU with the 2 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Install the No. 1 ECU integration bracket with the 2 nuts.

    3. Connect each connector.

  2. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY

    Click here

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  4. INSTALL NO. 1 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY

    Click here

  5. INSTALL INSTRUMENT PANEL ORNAMENT

    Click here

  6. INSTALL INSTRUMENT SIDE PANEL RH

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  8. INSTALL COWL TOP VENTILATOR LOUVER RH

    Click here

  9. CHECK SRS WARNING LIGHT

    Click here