POWER STEERING ECU INSTALLATION

PROCEDURE


  1. INSTALL POWER STEERING ECU


    1. A0018WG

      Attach the claw and install the power steering ECU with the 4 bolts.

      Torque:
      8.5 N*m  { 87 kgf*cm, 75 in.*lbf }
    2. Connect connector C to the power steering ECU.

      A001F7IE01
    3. Connect the 2 power steering ECU connectors A and B and securely lock the connectors.

  2. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here

  3. INSTALL ENGINE ROOM SIDE COVER

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  5. INSTALL COWL TOP VENTILATOR LOUVER

    Click here

  6. PERFORM INITIALIZATION

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  7. PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION

    Click here