STEERING GEAR(for 2WD with VGRS) INSTALLATION

PROCEDURE


  1. INSTALL POWER STEERING LINK ASSEMBLY


    1. Install the power steering link and rack housing bracket to the front frame with the 4 bolts and 4 nuts.

      Torque:
      70 N*m  { 714 kgf*cm, 52 ft.*lbf }
      A001CU3E02
      Text in Illustration
      *A for LHD *B for RHD
    2. for LHD:

      Connect the 5 connectors and attach the 3 clips.

      A001F3K
    3. for RHD:

      Connect the 5 connectors and attach the 5 clips.

      A00191J
  2. CONNECT TIE ROD ASSEMBLY LH


    1. Connect the tie rod LH to the steering knuckle with the nut.

      Torque:
      60 N*m  { 612 kgf*cm, 44 ft.*lbf }
    2. Install a new clip.

  3. CONNECT TIE ROD ASSEMBLY RH

    Tech Tips

    Use the same procedures described for the LH side.

  4. CONNECT STEERING SLIDING WITH SHAFT YOKE SUB-ASSEMBLY

    Click here

  5. INSTALL NO. 2 ENGINE UNDER COVER

    Click here

  6. INSTALL FRONT SUSPENSION MEMBER PROTECTOR LOWER

    Click here

  7. INSTALL NO. 1 ENGINE UNDER COVER

    Click here

  8. INSTALL FRONT WHEELS

    Torque:
    140 N*m  { 1428 kgf*cm, 103 ft.*lbf }
  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  10. INSTALL COWL TOP VENTILATOR LOUVER

    Click here

  11. PLACE FRONT WHEELS FACING STRAIGHT AHEAD

  12. PERFORM INITIALIZATION

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  13. CHECK SUSPENSION CONTROL SYSTEM

    Click here

  14. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT

    Click here

  15. ADJUST HEADLIGHT AIMING

    Click here

  16. ADJUST OBJECT RECOGNITION CAMERA

    Click here

  17. CHECK SRS WARNING LIGHT

    Click here

  18. INITIALIZE ROTATION ANGLE SENSOR AND CALIBRATE TORQUE SENSOR ZERO POINT

    Click here

  19. PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION

    Click here