PROCEDURE
INSTALL STEERING INTERMEDIATE SHAFT
| *a | Matchmark |
Align the matchmarks on the power steering link and intermediate shaft.
Install the bolt.
INSTALL POWER STEERING LINK ASSEMBLY
Install the power steering link and rack housing bracket to the front frame with the 4 bolts and 4 nuts.
| *A | for LHD | *B | for RHD |
for LHD:
Connect the 3 connectors and attach the 3 clips.
for RHD:
Connect the 3 connectors and attach the 2 clips.
CONNECT TIE ROD ASSEMBLY LH
Connect the tie rod LH to the steering knuckle with the nut.
Install a new clip.
CONNECT TIE ROD ASSEMBLY RH
Tech Tips
Use the same procedures described for the LH side.
CONNECT STEERING SLIDING WITH SHAFT YOKE SUB-ASSEMBLY
INSTALL NO. 2 ENGINE UNDER COVER
INSTALL FRONT SUSPENSION MEMBER PROTECTOR LOWER
INSTALL NO. 1 ENGINE UNDER COVER
INSTALL FRONT WHEELS
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
INSTALL COWL TOP VENTILATOR LOUVER
PLACE FRONT WHEELS FACING STRAIGHT AHEAD
PERFORM INITIALIZATION
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
CHECK SUSPENSION CONTROL SYSTEM
INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
ADJUST HEADLIGHT AIMING
ADJUST OBJECT RECOGNITION CAMERA
CHECK SRS WARNING LIGHT
INITIALIZE ROTATION ANGLE SENSOR AND CALIBRATE TORQUE SENSOR ZERO POINT