TCM INSTALLATION

PROCEDURE


  1. INSTALL TCM


    1. Install the TCM with the 2 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 48 in.*lbf }
    2. Connect the 4 connectors.

  2. INSTALL ENGINE ROOM ECU COVER

    Click here

  3. INSTALL ENGINE ROOM SIDE COVER LH

    Click here

  4. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  6. INSTALL COWL TOP VENTILATOR LOUVER

    Click here

  7. PERFORM RESET MEMORY

    Click here