DESCRIPTION
When the ignition switch is turned to ON, the battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the coil of the No. 1 integration relay (EFI MAIN relay), closing the contacts and supplying power to terminals +B of the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK NO. 1 INTEGRATION RELAY (POWER SOURCE)
| *a | Front view of wire harness connector (to No. 1 Integration Relay) |
Remove the No. 1 integration relay from the No. 1 engine room relay block and junction block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 1 INTEGRATION RELAY - BATTERY) |
| OK |
|
INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN)
Inspect the No. 1 integration relay (EFI MAIN) Click here.
| NG |
|
REPLACE NO. 1 INTEGRATION RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM, BODY GROUND)
Remove the No. 1 integration relay from the No. 1 engine room relay block and junction block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT ECM (IGSW VOLTAGE)
| *a | Front view of wire harness connector (to ECM) |
Disconnect the ECM connectors.
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
CHECK NO. 2 INTEGRATION RELAY (POWER SOURCE) Click here |
| OK |
|
REPLACE ECM Click here
CHECK NO. 2 INTEGRATION RELAY (POWER SOURCE)
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
Remove the No. 2 integration relay from the instrument panel relay block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT NO. 2 INTEGRATION RELAY (IG2)
Inspect the No. 2 integration relay (IG2) Click here.
| NG |
|
REPLACE NO. 2 INTEGRATION RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - IGNITION SWITCH, ECM, BODY GROUND)
Disconnect the ECM connector.
Disconnect the ignition switch connector.
Remove the No. 2 integration relay from the instrument panel relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT IGNITION SWITCH
Inspect the ignition switch Click here.
| NG |
|
REPLACE IGNITION SWITCH |
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH - BATTERY)