AIR CONDITIONING SYSTEM PTC Heater Circuit

DESCRIPTION

The PTC heater is installed in the radiator in the heater unit and operates when cooling water temperature is low and normal heater effectiveness is insufficient.

The air conditioning amplifier switches the circuit in the PTC relay and operates the PTC heater when the operating conditions (cooling water temperature is below 55°C (131°F), setting temperature is MAX. HOT, air outlet damper position is FOOT or FOOT/DEF, and blower switch is not OFF) are met.

WIRING DIAGRAM

A01H1Q9E01

INSPECTION PROCEDURE

PROCEDURE


  1. INSPECT FUSE (PTC HTR1, PTC HTR3, PTC HTR)


    1. Remove the PTC HTR1 and PTC HTR3 fuses from the engine room No. 4 relay block, and PTC HTR H-fuse from the engine room No. 1 junction block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance
      Tester Connection Condition Specified Condition
      PTC HTR1 fuse Always Below 1 Ω
      PTC HTR3 fuse
      PTC HTR H-fuse

    NG
    OK
  2. CHECK AIR CONDITIONING AMPLIFIER

    A01H1VIE04

    1. Remove the air conditioning amplifier with its connectors still connected Click here.

    2. Measure the voltage according to the value(s) in the table below.

      Standard voltage
      Tester Connection Condition Specified Condition
      L76-27 (PTC1) - Body ground

      Power switch ON (IG)

      Temperature setting: MAX. HOT

      MODE switch: FOOT

      Engine coolant temperature: 55°C (131°F) or lower

      Blower switch: OFF

      11 to 14 V
      L76-35 (PTC3) - Body ground

    NG
    OK
  3. INSPECT PTC HEATER RELAY (PTC HTR1, PTC HTR3)

    A01GWVBE01

    1. Remove the PTC heater relays from the No. 4 relay block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance
      Tester Connection Condition Specified Condition
      3 - 5 When battery voltage is not applied between terminals 1 and 2 10 kΩ or higher
      When battery voltage is applied to terminals 1 and 2 Below 1 Ω

    NG
    OK
  4. CHECK HARNESS AND CONNECTOR (PTC HEATER RELAY - PTC HEATER)

    A01H1AFE01

    1. Remove the PTC heater relays from the No. 4 relay block.

    2. Disconnect the L40 PTC heater connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard resistance
      Tester Connection Condition Specified Condition
      PTC HTR1 terminal 3 - L40-1 (B) Always Below 1 Ω
      PTC HTR3 terminal 3 - L40-3 (B)

    NG
    OK
  5. CHECK PTC HEATER

    A01H0Q3E02

    1. Disconnect the L40 and L41 PTC heater connectors.

    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance
      Tester Connection Condition Specified Condition
      L40-1 (B) - L41-1 (E) Always Below 1 Ω
      L40-3 (B) - L41-2 (E)

    NG
    OK
  6. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BODY GROUND)

    A01GXK6E08

    1. Disconnect the L76 air conditioning amplifier connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance
      Tester Connection Condition Specified Condition
      L76-27 (PTC1) - Body ground Always Below 1 Ω
      L76-35 (PTC3) - Body ground

    NG
    OK