STARTER (for 2.2 kW Type) INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. A01BCUV

      Install the starter with the bolt and nut.

      Torque:
      68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    2. A01BBES

      Connect the wire harness to terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 7.2 ft.*lbf }
    3. Close the terminal cap.

    4. Connect the terminal 50 connector to the starter.

    5. A01BG1IE01

      for Wide Body:

      Install the ground cable with the bolt.

      Torque:
      25 N*m  { 250 kgf*cm, 18 ft.*lbf }
  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  3. PERFORM INITIALIZATION


    1. Some system need initialization when reconnecting the battery cable. Click here