INSTALL FUEL TEMPERATURE SENSOR
Apply a light coat of light oil to a new O-ring.
Install the O-ring onto the fuel temperature sensor.
Using the SST, install the fuel temperature sensor.
Note
Refer to the torque above when not using SST. When using SST, calculate the torque in accordance with the lengths of SST and the torque wrench Click here.
INSTALL INJECTION OR SUPPLY PUMP ASSEMBLY
Install a new O-ring and the pulley key onto the fuel supply pump.
Aligning the projecting edge of the fuel supply pump head to the key-slot of the supply pump gear, install the pump onto the timing gear case.
While holding the fuel supply pump by hand, push the supply pump gear rearward to engage the pump gear and drive shaft.
Temporarily install the fuel supply pump with the 2 nuts.
Using SST, hold the crankshaft.
Install the supply pump gear set nut.
Tech Tips
Set a new O-ring before tightening the supply pump gear set nut.
Temporarily install the supply pump stay with the 2 nuts on the engine block side.
Tighten the 2 nuts to the specified torque.
Install the No. 2 camshaft timing pulley flange and the pump drive shaft pulley with the 4 bolts.
INSTALL VANE PUMP ASSEMBLY
INSTALL FUEL INLET PIPE SUB-ASSEMBLY
Note
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket, or timing gear case with a new one, replace the fuel inlet pipe.
Be careful not to adhere dusts, dirt or any other materials onto the joint area of the fuel inlet pipe.
Temporarily install the fuel inlet pipe.
Connect the No. 1 injection pipe clamp with the bolt.
Install the No. 2 injection pipe clamp with the bolt.
Using SST, tighten the union nut on the common rail side.
Tech Tips
Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
This torque value is effective when SST is parallel to a torque wrench.
Using SST, tighten the union nut on the supply pump side.
Tech Tips
Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
This torque value is effective when SST is parallel to a torque wrench.
INSTALL OIL LEVEL GAUGE GUIDE
Install a new O-ring onto the oil level gauge guide.
Apply a light coat of engine oil to the O-ring.
Install the oil level gauge guide with the bolt.
Install the oil level gauge.
TEMPORARILY TIGHTEN EGR COOLER ASSEMBLY
Temporarily tighten the EGR cooler assembly.
Temporarily tighten the EGR cooler assembly and new gaskets.
Temporarily tighten the EGR cooler assembly stay bolt.
Tighten the EGR cooler assembly with the 2 nuts and 2 bolts.
TIGHTEN EGR COOLER ASSEMBLY
Tighten the EGR cooler assembly stay bolt.
Install the No. 2 water by-pass hose with the clip.
Install the No. 4 water by-pass hose with the clip.
INSTALL DIESEL THROTTLE BODY ASSEMBLY
Note
After removing and installing, or replacing the throttle body, be sure to perform the operation check.
Install a new gasket onto the intake air connector.
Install the throttle body with the 2 bolts and the 2 nuts.
Connect the 2 throttle body connectors.
INSTALL NO. 4 AIR HOSE
Install the No. 4 air hose with the 2 clamps.
CONNECT OIL RETURN HOSE
Connect the oil return hose with the 2 clips.
INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY
Install the vane pump oil reservoir assembly with the 2 bolts.
INSTALL TIMING BELT
Check that the timing marks are aligned as shown in the illustration.
Tech Tips
If reusing the timing belt, align the matchmarks marked during removal, and install the belt with the direction arrow pointing in the direction of engine revolution.
Note
The engine should be cold.
When turning the crankshaft, the valve heads will hit against the piston's top position. Do not turn it more than necessary.
Install the timing belt to pump drive shaft pulley, camshaft timing pulley and No.1 timing belt idler in sequence.
Place the tensioner upright into a press. Then set the press to the top of tensioner.
Note
Do not scratch and deform the rod end.
Press the tensioner rod in upward.
Protect the tip of the push rod with a shop rag or piece of cloth in order to prevent damage.
Using the press, slowly apply 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force to the push rod.
Note
Do not apply a load of 981 to 9807 N (100 to 1000 kgf, 220 to 2205 lbf) or more to the push rod.
Align the holes of the push rod and housing and pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.
Temporarily install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.
Tighten the 2 bolts.
Note
Uniformly tighten the 2 bolts when installing the tensioner
Remove the 1.27 mm hexagon wrench from the tensioner.
Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.
INSTALL NO. 1 TIMING BELT COVER
Install the No.1 timing belt cover with the 6 bolts.
Install the wire harness clamp.
INSTALL FAN & GENERATOR V BELT
Rotate the V-ribbed belt tensioner pulley clockwise, and then install the fan and generator V belt.
Note
Make sure that the fan and generator V belt is set properly on each pulley.
Check that the indicator mark of the V-ribbed belt tensioner Click here.
INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
Install the engine service hole sub cover sub-assembly with the 5 bolts.
INSTALL FRONT DOOR SCUFF PLATE RH
INSTALL FRONT SEAT ASSEMBLY RH
Connect the front seat inner belt assembly connector and install the front seat assembly.
Align the front seat assembly adjuster pin with the holes in the body.
Move the front seat assembly to the rearmost position.
Note
Make sure that the front seat assembly is securely locked.
Temporarily tighten the 2 bolts on the front side of the front seat assembly.
Move the front seat assembly fully forward.
Note
Make sure that the front seat assembly is securely locked.
Temporarily tighten the 2 bolts on the rear side of the front seat assembly.
Move the front seat assembly to the rearmost position.
Note
Make sure that the front seat assembly is securely locked.
Fully tighten the 2 bolts on the front side of the front seat assembly in the order of outer and inner side.
Move the front seat assembly fully forward.
Note
Make sure that the front seat assembly is securely locked.
Fully tighten the 2 bolts on the rear side of the front seat assembly in the order of outer and inner side.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
ADD ENGINE COOLANT
Firmly tighten the drain plugs.
Fill the radiator reserve tank assembly with coolant to the top of the inlet.
| Coolant capacity | ||||||
|---|---|---|---|---|---|---|
|
Note
Do not substitute plain water for engine coolant.
Tech Tips
Use of improper coolants may damage the engine cooling system.
Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
Loosen the bleeder plug of the outlet housing.
When air is bled and the coolant drains out, firmly install the bleeder plug.
Add coolant up to the B line mark in the radiator reserve tank assembly and install the radiator cap.
Warm up the engine until the thermostat opens.
While the thermostat is open, circulate the coolant for several minutes.
Tech Tips
The thermostat open timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.
After the engine cools down, check that the coolant level is between the LOW and FULL level marks.
BLEED FUEL LINE
Using a hand pump, bleed air from the fuel system until pumping becomes difficult.
INSPECT FOR ENGINE COOLANT LEAK
INSPECT FOR FUEL LEAK
Perform the Active Test.
Connect the intelligent tester to the DLC3.
Turn the ignition switch ON.
Turn the intelligent tester ON.
Select the following menu items: Powertrain / ECD / Active Test.
Perform the Active Test.
| Intelligent Tester Display | Test Details | Control Range | Diagnostic Notes |
|---|---|---|---|
| Test the Fuel Leak | Pressurizes common rail internal fuel pressure, and checks for fuel leaks | Stop/Start |
|
INSPECT FOR OIL LEAK
INSPECT FOR EXHAUST GAS LEAK
PERFORM INITIALIZATION
Perform initialization procedures Click here.
Note
Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.