INSTALL THROTTLE BODY ASSEMBLY
Install a new gasket onto the intake manifold.
Tech Tips
Fit the gasket to the cutout of the intake manifold.
Install the throttle body assembly with the 2 bolts and 2 nuts. (A)
Connect the water by-pass hose. (B)
Connect the water by-pass hose No.2. (C)
Connect the throttle motor connector. (D)
INSTALL INTAKE AIR CONNECTOR
Temporarily install the intake air connector to the throttle body assembly.
Connect the ventilation hose No.2 and the vacuum hose. (A)
Install the intake air connector with the 2 bolts. (B)
Tighten the 2 hose clamp bolts. (C)
Tighten the 2 hose clamp bolts. (D)
ADD ENGINE COOLANT
Firmly tighten the drain plugs and fill the reservoir tank with coolant to the top of the inlet.
Remove the 2-way that is located near the throttle body.
When air is bled and the coolant drains out, firmly install the 2-way.
Add coolant up to the B line mark in the reservoir tank and install the radiator cap.
| Coolant Capacity | ||||||||
|---|---|---|---|---|---|---|---|---|
|
Warm up the engine.
After the engine cools down, check that the coolant level is between the LOW and FULL level marks.
INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
Install the engine service hole sub cover with the 5 bolts.
INSTALL FRONT DOOR SCUFF PLATE RH
INSTALL FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type)
INSTALL FRONT SEAT ASSEMBLY RH (for Low-back Seat Type)
INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1)
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
INSPECT THROTTLE BODY ASSEMBLY
PERFORM INITIALIZATION