ENGINE UNIT REASSEMBLY

PROCEDURE


  1. INSTALL RING PIN

    Note

    It is not necessary to remove a ring pin unless it is being replaced.


    1. Using a plastic-faced hammer, tap in new ring pins to the camshaft housing.

      Standard protrusion height
      2.7 to 3.3 mm (0.106 to 0.130 in.)
      B004WB1C01
      *a LH Side *b RH Side
      *c Protrusion Height - -
  2. INSTALL NO. 1 STRAIGHT PIN

    Note

    It is not necessary to remove a No. 1 straight pin unless it is being replaced.


    1. Using a plastic-faced hammer, tap in new No. 1 straight pins to the camshaft housing.

      Standard protrusion height
      7.7 to 8.3 mm (0.303 to 0.327 in.)
      B004YDZC01
      *a LH Side *b RH Side
      *c Protrusion Height - -
  3. INSTALL REAR ENGINE OIL SEAL


    1. Place the rear engine oil seal retainer on wooden blocks.

    2. B004UZVE01

      Using SST, tap in a new rear engine oil seal until its surface is flush with the rear engine oil seal retainer edge.

      SST
      09223-15030   ( 09951-07150 )
      Oil Seal Protrusion Height
      -0.5 to 0.5 mm (-0.0197 to 0.0197 in.)

      Note


      • Keep the lip free of foreign matter.

      • Do not tap on the rear engine oil seal at an angle.

  4. INSTALL REAR ENGINE OIL SEAL RETAINER


    1. Apply MP grease to the lip of the rear engine oil seal.

    2. B004YF4C01
      *a Seal Packing

      Apply seal packing in a continuous line as shown in the illustration.

      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
      Seal diameter
      2.0 to 3.0 mm (0.0787 to 0.118 in.)

      Note


      • Remove any oil from the contact surface.

      • Install the engine rear engine oil seal retainer within 3 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installation.

    3. B004SBPN02

      Install the rear engine oil seal retainer with the 6 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Be sure to apply adhesive 1324 to the bolts in the places indicated by A before installing them.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
  5. INSTALL CYLINDER BLOCK WATER JACKET SPACER


    1. B004S7RC02
      B004SZX Front Side

      Install the 2 water jacket spacers as shown in the illustration.

  6. INSTALL NO. 1 WATER OUTLET PIPE


    1. Install the No. 1 water outlet pipe with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  7. INSTALL KNOCK CONTROL SENSOR

    Click here

  8. INSTALL SENSOR WIRE


    1. Install the No. 5 engine wire with the 2 connectors and clamp.

  9. INSTALL CYLINDER HEAD GASKET

    Click here

  10. INSTALL CYLINDER HEAD SUB-ASSEMBLY

    Click here

  11. INSTALL NO. 2 CYLINDER HEAD GASKET

    Click here

  12. INSTALL CYLINDER HEAD LH

    Click here

  13. INSTALL VALVE STEM CAP

    Click here

  14. INSTALL VALVE LASH ADJUSTER ASSEMBLY

    Click here

  15. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY

    Click here

  16. INSTALL CAMSHAFT BEARING CAP OIL HOLE GASKET


    1. Install the camshaft bearing cap oil hole gasket to the No. 6 camshaft bearing cap.

    2. Install the camshaft bearing cap oil hole gasket to the No. 7 camshaft bearing cap.

  17. INSTALL OIL CONTROL VALVE FILTER LH


    1. B004RMGC01
      *a Camshaft Installation Surface

      Install the oil control valve filter LH to the camshaft bearing cap.

      Note

      Make sure the oil control valve filter does not protrude past the camshaft installation surface shown in the illustration.

  18. INSTALL OIL CONTROL VALVE FILTER RH

    Tech Tips

    Use the same procedure described for the LH side.

  19. INSTALL NO. 3 CAMSHAFT SUB-ASSEMBLY

    Click here

  20. INSTALL NO. 4 CAMSHAFT SUB-ASSEMBLY

    Click here

  21. INSTALL CAMSHAFT BEARING CAP (for Bank 2)

    Click here

  22. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY LH

    Click here

  23. INSTALL CAMSHAFT

    Click here

  24. INSTALL NO. 2 CAMSHAFT

    Click here

  25. INSTALL FUEL PUMP LIFTER HOUSING

    Click here

  26. INSTALL CAMSHAFT BEARING CAP (for Bank 1)

    Click here

  27. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY RH

    Click here

  28. INSTALL NO. 2 CHAIN TENSIONER ASSEMBLY

    Click here

  29. INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 1)

    Click here

  30. TEMPORARILY INSTALL CAMSHAFT TIMING GEAR BOLT (for Intake Side of Bank 1)

    Click here

  31. TEMPORARILY INSTALL CAMSHAFT TIMING GEAR BOLT (for Exhaust Side of Bank 1)

    Click here

  32. TIGHTEN CAMSHAFT TIMING GEAR BOLT (for Bank 1)

    Click here

  33. INSTALL NO. 3 CHAIN TENSIONER ASSEMBLY

    Click here

  34. INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 2)

    Click here

  35. TEMPORARILY INSTALL CAMSHAFT TIMING GEAR BOLT (for Intake Side of Bank 2)

    Click here

  36. TEMPORARILY INSTALL CAMSHAFT TIMING GEAR BOLT (for Exhaust Side of Bank 2)

    Click here

  37. TIGHTEN CAMSHAFT TIMING GEAR BOLT (for Bank 2)

    Click here

  38. INSTALL NO. 1 CHAIN VIBRATION DAMPER


    1. Install the No. 1 chain vibration damper with the 2 bolts.

      Torque:
      22.5 N*m  { 229 kgf*cm, 17 ft.*lbf }
  39. INSTALL NO. 2 CHAIN VIBRATION DAMPER


    1. Install the 2 No. 2 chain vibration dampers.

  40. INSTALL CRANKSHAFT TIMING GEAR OR SPROCKET


    1. Install the 2 timing gear set keys and camshaft timing gear or sprocket to the crankshaft.

  41. INSTALL IDLE SPROCKET ASSEMBLY


    1. B004RVMC02
      *1 No. 1 Idle Gear Shaft
      *2 Idle Sprocket
      *3 No. 2 Idle Gear Shaft
      *a Knock Pin
      B004SZX Apply Engine Oil

      Apply a light coat of engine oil to the rotating surface of the No. 1 idle gear shaft.

    2. Temporarily install the No. 1 idle gear shaft and idle sprocket with the No. 2 idle gear shaft while aligning the knock pin of the No. 1 idle gear with the knock pin groove of the cylinder block.

      Note

      Make sure that the idle gear is facing the correct direction.

      Tech Tips

      Check that no foreign objects are on the No. 1 and No. 2 idle gear shafts.

    3. Using a 10 mm hexagon wrench, tighten the No. 2 idle gear shaft.

      Torque:
      60 N*m  { 612 kgf*cm, 44 ft.*lbf }

      Tech Tips

      After installing the idle sprocket assembly, check that the idle sprocket turns smoothly.

  42. INSTALL CHAIN SUB-ASSEMBLY


    1. Check that the camshaft timing gear position on the RH bank and the timing marks on the LH bank and crankshaft are positioned as shown in the illustration.

      B004WZCC01
      *a Timing Mark *b Center Line
    2. B004WC1C01
      *a Mark Plate (Yellow)
      *b Timing Mark

      Align the mark plates and timing marks as shown in the illustration and install the chain sub-assembly.

      Tech Tips

      The camshaft mark plates are yellow.

    3. B004VBV

      Rest the chain sub-assembly on top of the crankshaft.

    4. B004WIOC02
      *a When idle sprocket is reused
      *b Mark
      *c Align
      *d Chain Plate
      B004SZX Turn

      Turn the camshaft timing gear assembly on the RH bank counterclockwise to tighten the chain sub-assembly between the banks.

      Note

      When the idle sprocket is reused, align the chain plate with the mark where the plate had been in order to tighten the chain sub-assembly between the banks.

    5. B004RGZC01
      *a Mark Plate (Pink)
      *b Timing Mark

      Align the mark plate and timing mark as shown in the illustration and install the chain sub-assembly onto the crankshaft timing sprocket.

      Tech Tips

      The crankshaft mark plate is pink.

    6. Temporarily install the pulley set bolt.

    7. B004Y0ZC02
      *a Timing Mark
      *b Center Line
      B004SZX Turn

      Turn the crankshaft clockwise 10° to set it to the RH block bore center line (TDC/compression).

  43. INSTALL CHAIN TENSIONER SLIPPER


    1. Install the chain tensioner slipper.

  44. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY


    1. B004WMXC06
      *a Stopper Plate
      *b Plunger
      *c Pin

      Move the stopper plate upward to release the lock, and push the plunger deep into the No. 1 chain tensioner assembly.

    2. Move the stopper plate downward to set the lock, and insert a pin of 1.27 mm (0.0500 in.) diameter into the hole of the stopper plate.

    3. Install the No. 1 chain tensioner assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Remove the lock pin of the No. 1 chain tensioner assembly.

  45. INSPECT VALVE TIMING


    1. Check the camshaft timing marks.

      Note


      • Check each timing mark from a viewpoint directly inline with the center of the camshaft and the timing mark on each camshaft timing gear.

      • If the timing marks are checked from any other viewpoint, the valve timing may appear misaligned.

    2. Check that each camshaft timing mark is positioned as shown in the illustration.

      B004TUFC02
      *a Timing Mark *b Viewpoint

      Tech Tips

      For the intake camshaft:

      B004XC7N02

      Be sure to check mark A at the point when marks B, C, and D are positioned in line. If the marks are checked from any other viewpoint, they cannot be checked correctly.

    3. If the valve timing is misaligned, reinstall the timing chain.

    4. Remove the pulley set bolt.

  46. INSTALL ENGINE WATER PUMP ASSEMBLY

    Click here

  47. INSTALL TIMING CHAIN COVER ASSEMBLY

    Click here

  48. INSTALL TIMING CHAIN CASE OIL SEAL

    Click here

  49. INSTALL NO. 1 OIL PAN BAFFLE PLATE


    1. B004VX8N02

      for 2WD:


      1. Install the No. 1 oil pan baffle plate with the 8 bolts.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }

        Tech Tips

        Temporarily install the 8 bolts. Tighten the 2 bolts A shown in the illustration before tightening the other bolts.

    2. B004YBCN02

      for AWD:


      1. Install the No. 1 oil pan baffle plate with the 7 bolts.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }

        Tech Tips

        Temporarily install the 8 bolts. Tighten the 2 bolts A shown in the illustration before tightening the other bolts.

  50. INSTALL OIL STRAINER SUB-ASSEMBLY

    Click here

  51. INSTALL OIL PAN SUB-ASSEMBLY

    Click here

  52. INSTALL OIL LEVEL SENSOR BRACKET

    Click here

  53. INSTALL ENGINE OIL LEVEL SENSOR

    Click here

  54. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY

    Click here

  55. INSTALL OIL PAN DRAIN PLUG


    1. Install a new gasket and the oil pan drain plug.

      Torque:
      40 N*m  { 408 kgf*cm, 30 ft.*lbf }
  56. INSTALL SPARK PLUG TUBE GASKET


    1. Install 6 new spark plug tube gaskets to the cylinder head cover sub-assembly.

  57. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

    Click here

  58. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH

    Click here

  59. INSTALL FUEL PUMP SPACER GASKET


    1. Install a new fuel pump spacer gasket to the cylinder head cover.

  60. INSTALL REAR WATER BY-PASS JOINT


    1. Install a new O-ring to the No. 1 water outlet pipe.

      Tech Tips

      Apply water to the O-ring.

    2. Install 2 new gaskets to the rear water by-pass joint.

    3. Install the rear water by-pass joint with the 4 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Be careful that the O-ring does not get caught between the parts.

  61. INSTALL ENGINE COOLANT TEMPERATURE SENSOR

    Click here

  62. INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY


    1. Install a new gasket to the water inlet with thermostat sub-assembly.

    2. Install the water inlet with thermostat sub-assembly with the 2 bolts and nut.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  63. INSTALL WATER OUTLET


    1. Install a new O-ring to the water outlet pipe sub-assembly.

      Tech Tips

      Apply water to the O-ring.

    2. Install the water outlet with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }

      Note

      Be careful that the O-ring does not get caught between the parts.

  64. INSTALL CRANKSHAFT PULLEY

    Click here

  65. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY

    Click here

  66. INSTALL OIL FILTER CAP ASSEMBLY

    Click here

  67. INSTALL OIL COOLER ASSEMBLY (w/ Oil Cooler)

    Click here

  68. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY

    Click here

  69. INSTALL CYLINDER BLOCK WATER DRAIN COCK SUB-ASSEMBLY


    1. Apply adhesive to the cylinder block water drain cock sub-assembly and taper screw plug.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

      Note

      Install the cylinder block water drain cock sub-assembly and taper screw plug within 3 minutes of applying adhesive.

    2. B004X0HC03
      *a RH Side
      *b LH Side

      Install the cylinder block water drain cock sub-assembly as shown in the illustration.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }

      Note

      Do not rotate the cylinder block water drain cock sub-assembly more than 1 revolution (360°) after tightening the cylinder block water drain cock sub-assembly to the specified torque.

    3. Install the cylinder block water drain cock plug to the cylinder block water drain cock sub-assembly.

      Torque:
      12.7 N*m  { 130 kgf*cm, 9 ft.*lbf }
    4. Install the taper screw plug.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
  70. INSTALL CRANKSHAFT POSITION SENSOR

    Click here

  71. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 1)

    Click here

  72. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Exhaust Side of Bank 1)

    Click here

  73. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 2)

    Click here

  74. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Exhaust Side of Bank 2)

    Click here

  75. INSTALL PCV VALVE

    Click here

  76. INSTALL NO. 1 FUEL TUBE SUB-ASSEMBLY

    Click here

  77. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

    Click here

  78. INSTALL SPARK PLUG

    Click here