STARTER INSTALLATION

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    2. Connect the connector.

    3. Connect the wire harness and install the nut, close the cap.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  2. INSTALL BATTERY

    Click here

  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  6. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  7. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

    Click here

  8. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.