ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. Connect the 2 wire harness clamps.

    3. Install the nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  2. INSTALL ECM


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. B001NYPE06

      Temporarily install the screw (B).

    3. Install the ECM with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    4. Install the screw (A).

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    5. Tighten the screw (B).

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    6. Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the connectors, make sure that dirt, water or other foreign matter is not stuck between the connectors and connecting part of the ECM.

      • Make sure that the 2 levers are securely locked.

  3. INSTALL BATTERY

    Click here

  4. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  6. PERFORM INITIALIZATION

    Click here