PCV VALVE INSTALLATION

PROCEDURE


  1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    1. Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.

      Adhesive
      Toyota genuine adhesive 1324, three bond 1324 or equivalent
    2. Using a ball joint lock nut wrench (22 mm), install the ventilation valve sub-assembly.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }

      Note

      Use the torque value compensation formula to calculate the torque value for use when a torque wrench is combined with a tool such as a ball joint lock nut wrench Click here.

    3. Install the ventilation hose to the valve and intake manifold.

  2. INSTALL NO. 1 ENGINE UNDER COVER

  3. INSTALL AIR CLEANER CASE

    Click here

  4. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  6. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here