THERMOSTAT INSTALLATION
PROCEDURE
INSTALL THERMOSTAT
Install a new gasket to the thermostat.
-
*1
Jiggle Valve
Install the thermostat with the jiggle valve facing upward.
Tip:The jiggle valve may be set to within 10° on either side of the prescribed position.
INSTALL WATER INLET
Install the water inlet with the 3 bolts.
11 N*m
112 kgf*cm
8 ft.*lbf
INSTALL NO. 4 WATER BY-PASS PIPE
-
Apply soapy water to a new O-ring and install it to the No. 4 water by-pass pipe.
Install the No. 4 water by-pass pipe with the bolt.
11 N*m
112 kgf*cm
8 ft.*lbf
-
CONNECT NO. 2 RADIATOR HOSE
INSTALL NO. 2 WATER BY-PASS HOSE
-
*a
Top
*b
RH Side
*c
Rear Side
Install the No. 2 water by-pass hose to the No. 4 water by-pass pipe and radiator reservoir assembly, slide the 2 clamps to secure it.
Tip:The direction of the hose clamp is indicated in the illustration.
-
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSTALL NO. 1 ENGINE UNDER COVER