МАСЛЯНЫЙ РАДИАТОР УСТАНОВКА

PROCEDURE


  1. INSTALL OIL COOLER


    1. B006OJHN02

      Install the oil cooler to the transaxle case with the 2 bolts.

      Torque:
      11.5 N*m  { 117 kgf*cm, 8 ft.*lbf }

      Note

      Tightening order: Temporarily tighten bolt (A) → Fully tighten bolt (B) → Fully tighten bolt (A)

    2. Connect the inlet No. 1 oil cooler hose to the oil cooler and slide the clip to secure it.

      Note

      Align the paint mark on the inlet No. 1 oil cooler hose with the one on the oil cooler.

      B006O9WC01
      *1 Inlet No. 1 Oil Cooler Hose *2 Outlet No. 1 Oil Cooler Hose
      *a Black Mark *b Yellow Mark
      *c 2 to 7 mm (0.079 to 0.276 in.) - -
    3. Connect the outlet No. 1 oil cooler hose to the oil cooler and slide the clip to secure it.

      Note

      Align the paint mark on the outlet No. 1 oil cooler hose with the one on the oil cooler.

  2. CONNECT NO. 2 WATER BY-PASS HOSE


    1. Connect the No. 2 water by-pass hose to the oil cooler and slide the 2 clips to secure them.

      Note


      • Align each paint mark on the No. 2 water by-pass hose with each one on the oil cooler.

      • Fully insert the No. 2 water by-pass hose to the 2nd rib on each oil cooler pipe.

  3. INSTALL BATTERY CARRIER SUPPORT

    Click here

  4. INSTALL BATTERY CARRIER

    Click here

  5. INSTALL BATTERY

    Click here

  6. INSTALL CENTER NO. 1 COWL TOP VENTILATOR LOUVER

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  8. ADD ENGINE COOLANT

    Click here

  9. INSPECT FOR COOLANT LEAK

    Click here

  10. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

    Click here

  11. INSPECT FOR FLUID LEAK

  12. INSTALL REAR ENGINE UNDER COVER LH

    Click here