POWER BACK DOOR MAIN SWITCH INSPECTION
PROCEDURE
INSPECT POWER BACK DOOR MAIN SWITCH
Check the resistance.
-
*a
Component without harness connected
(Power Back Door Main Switch)
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Switch Condition
Specified Condition
9 (UL) - 6 (E)
Switch off
10 kΩ or higher
Switch on
Below 1 Ω
If the result is not as specified, replace the back door main switch.
-
-
*a
Component without harness connected
(Power Back Door Main Switch)
Inspect the illumination operation.
Apply battery voltage to the power back door main switch connector, and check that the power back door main switch LED illuminates.
OK
Measurement Condition
Specified Condition
Battery positive (+) → Terminal 8 (ILL+)
Battery negative (-) → Terminal 7 (ILL-)
LED illuminates
If the result is not as specified, replace the back door main switch.