PCV VALVE INSTALLATION

PROCEDURE

  1. INSTALL PCV VALVE

    1. Apply adhesive to 2 or 3 threads of the PCV valve.

      Adhesive

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    2. Using a 19 mm deep socket wrench, install the PCV valve to the PCV case.

      27 N*m

      275 kgf*cm

      20 ft.*lbf

    3. Install the No. 2 PCV hose to the PCV valve, and slide the clamp to secure the hose.

  2. INSTALL INTAKE MANIFOLD